IMPROVING THE EFFICIENCY OF WATER SHUT-OFF OPERATIONS IN GAS CONDENSATE WELLS WITH A SUBHORIZONTAL END OF THE TRUNK
The article discusses the main aspects of carrying out repair and insulation work to isolate the influx of formation water in wells with a subhorizontal borehole termination equipped with filters. To improve the technology for carrying out waterproofing work, requirements have been formed for compos...
Guardat en:
| Autors principals: | Gasumov, R. A., Гасумов, Р. А. |
|---|---|
| Format: | Статья |
| Idioma: | English |
| Publicat: |
Oil Gas Scientific Research Project Institute
2024
|
| Matèries: | |
| Accés en línia: | https://dspace.ncfu.ru/handle/123456789/29241 |
| Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
Ítems similars
-
Addictive Behavior of Adolescents in the Context of the Modern Socio-economic Crisis
per: Pogozheva, O. V., et al.
Publicat: (2022) -
Infrastructure development of an exploration well for the period of trial operation of the oil deposit of the West-Tarkosala oil and gas condensate field
per: Мохаммед Мустафа Басим Мохаммед
Publicat: (2024) -
Analyzing the efficiency of enhanced oil recovery methods for the Preobrazhensky horizon of the Talakan oil and gas condensate field
per: Мохамед Мохаб Саид Хассаан
Publicat: (2024) -
They shut me up in Prose
per: Emily E. D.
Publicat: (2013) -
Could I — then — shut the door
per: Emily E. D.
Publicat: (2013)