IMPROVING THE EFFICIENCY OF WATER SHUT-OFF OPERATIONS IN GAS CONDENSATE WELLS WITH A SUBHORIZONTAL END OF THE TRUNK
The article discusses the main aspects of carrying out repair and insulation work to isolate the influx of formation water in wells with a subhorizontal borehole termination equipped with filters. To improve the technology for carrying out waterproofing work, requirements have been formed for compos...
Сохранить в:
| Главные авторы: | Gasumov, R. A., Гасумов, Р. А. |
|---|---|
| 格式: | Статья |
| 语言: | English |
| 出版: |
Oil Gas Scientific Research Project Institute
2024
|
| 主题: | |
| 在线阅读: | https://dspace.ncfu.ru/handle/123456789/29241 |
| 标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Addictive Behavior of Adolescents in the Context of the Modern Socio-economic Crisis
由: Pogozheva, O. V., и др.
出版: (2022) -
Infrastructure development of an exploration well for the period of trial operation of the oil deposit of the West-Tarkosala oil and gas condensate field
由: Мохаммед Мустафа Басим Мохаммед
出版: (2024) -
Analyzing the efficiency of enhanced oil recovery methods for the Preobrazhensky horizon of the Talakan oil and gas condensate field
由: Мохамед Мохаб Саид Хассаан
出版: (2024) -
They shut me up in Prose
由: Emily E. D.
出版: (2013) -
Could I — then — shut the door
由: Emily E. D.
出版: (2013)