Preservation of filtration and capacity properties of productive formations during their temporary isolation
The article considers the preservation of the filtration-capacitive properties of the productive formation during well killing – during temporary isolation, which is part of the technological process aimed at stopping the flow of formation fluid into the wellbore. This procedure is carried out as pa...
Saved in:
| Main Authors: | Gasumov, R. A., Гасумов, Р. А. |
|---|---|
| Format: | Статья |
| Language: | Russian |
| Published: |
Geophysical Institute of the Vladikavkaz Scientific Centre of the Russian Academy of Sciences
2025
|
| Subjects: | |
| Online Access: | https://dspace.ncfu.ru/handle/123456789/31099 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
MATHEMATICAL MODEL FOR INJECTING VISCOELASTIC COMPOSITIONS INTO THE PRODUCTIVE FORMATION
by: Gasumov, R. A., et al.
Published: (2023) -
Causes of reservoir filtration properties deterioration and restoration methods in the process of drilling and well completion
by: Verisokin, A. E., et al.
Published: (2019) -
IMPROVING THE EFFICIENCY OF WATER SHUT-OFF OPERATIONS IN GAS CONDENSATE WELLS WITH A SUBHORIZONTAL END OF THE TRUNK
by: Gasumov, R. A., et al.
Published: (2024) -
Modeling of optimal parameters that ensure the effective performance of well killing in conditions of abnormally low reservoir pressure
by: Akhmedov, K. S., et al.
Published: (2024) -
The Role of Literary Text Generation in the Formation of Effective Educational Programs on Safety: Prospects and Challenges
by: Babenko, I. A., et al.
Published: (2025)