Preservation of filtration and capacity properties of productive formations during their temporary isolation
The article considers the preservation of the filtration-capacitive properties of the productive formation during well killing – during temporary isolation, which is part of the technological process aimed at stopping the flow of formation fluid into the wellbore. This procedure is carried out as pa...
Na minha lista:
| Principais autores: | Gasumov, R. A., Гасумов, Р. А. |
|---|---|
| Formato: | Статья |
| Idioma: | Russian |
| Publicado em: |
Geophysical Institute of the Vladikavkaz Scientific Centre of the Russian Academy of Sciences
2025
|
| Assuntos: | |
| Acesso em linha: | https://dspace.ncfu.ru/handle/123456789/31099 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Registros relacionados
-
MATHEMATICAL MODEL FOR INJECTING VISCOELASTIC COMPOSITIONS INTO THE PRODUCTIVE FORMATION
por: Gasumov, R. A., et al.
Publicado em: (2023) -
Causes of reservoir filtration properties deterioration and restoration methods in the process of drilling and well completion
por: Verisokin, A. E., et al.
Publicado em: (2019) -
IMPROVING THE EFFICIENCY OF WATER SHUT-OFF OPERATIONS IN GAS CONDENSATE WELLS WITH A SUBHORIZONTAL END OF THE TRUNK
por: Gasumov, R. A., et al.
Publicado em: (2024) -
Modeling of optimal parameters that ensure the effective performance of well killing in conditions of abnormally low reservoir pressure
por: Akhmedov, K. S., et al.
Publicado em: (2024) -
The Role of Literary Text Generation in the Formation of Effective Educational Programs on Safety: Prospects and Challenges
por: Babenko, I. A., et al.
Publicado em: (2025)