Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Sábháilte in:
| Príomhchruthaitheoir: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Formáid: | ВКР |
| Teanga: | Russian |
| Foilsithe / Cruthaithe: |
2025
|
| Rochtain ar líne: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Míreanna comhchosúla
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
de réir: Альбу-Салих Хуссейн Али Хачим
Foilsithe / Cruthaithe: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
de réir: Голлам Абед
Foilsithe / Cruthaithe: (2025) -
Improvement of the well cementing technology
de réir: Minchenko, Y. S., et al.
Foilsithe / Cruthaithe: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
de réir: Давир Ибран Мизрах Эль Неум
Foilsithe / Cruthaithe: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
de réir: Захер Девид Самех Нессим
Foilsithe / Cruthaithe: (2025)