Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Gardado en:
| Autor Principal: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Formato: | ВКР |
| Idioma: | Russian |
| Publicado: |
2025
|
| Acceso en liña: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Метки: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
Títulos similares
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
por: Альбу-Салих Хуссейн Али Хачим
Publicado: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
por: Голлам Абед
Publicado: (2025) -
Improvement of the well cementing technology
por: Minchenko, Y. S., и др.
Publicado: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
por: Давир Ибран Мизрах Эль Неум
Publicado: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
por: Захер Девид Самех Нессим
Publicado: (2025)