Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
保存先:
| 第一著者: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| フォーマット: | ВКР |
| 言語: | Russian |
| 出版事項: |
2025
|
| オンライン・アクセス: | https://dspace.ncfu.ru/handle/123456789/31869 |
| タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
著者:: Альбу-Салих Хуссейн Али Хачим
出版事項: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
著者:: Голлам Абед
出版事項: (2025) -
Improvement of the well cementing technology
著者:: Minchenko, Y. S., 等
出版事項: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
著者:: Давир Ибран Мизрах Эль Неум
出版事項: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
著者:: Захер Девид Самех Нессим
出版事項: (2025)