Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Sparad:
| Huvudupphovsman: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Materialtyp: | ВКР |
| Språk: | Russian |
| Publicerad: |
2025
|
| Länkar: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Taggar: |
Lägg till en tagg
Inga taggar, Lägg till första taggen!
|
Liknande verk
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
av: Альбу-Салих Хуссейн Али Хачим
Publicerad: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
av: Голлам Абед
Publicerad: (2025) -
Improvement of the well cementing technology
av: Minchenko, Y. S., et al.
Publicerad: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
av: Давир Ибран Мизрах Эль Неум
Publicerad: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
av: Захер Девид Самех Нессим
Publicerad: (2025)