Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Сохранить в:
| 主要作者: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| 格式: | ВКР |
| 语言: | Russian |
| 出版: |
2025
|
| 在线阅读: | https://dspace.ncfu.ru/handle/123456789/31869 |
| 标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
由: Альбу-Салих Хуссейн Али Хачим
出版: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
由: Голлам Абед
出版: (2025) -
Improvement of the well cementing technology
由: Minchenko, Y. S., и др.
出版: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
由: Давир Ибран Мизрах Эль Неум
出版: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
由: Захер Девид Самех Нессим
出版: (2025)