Reduction of well stimulation period after hydraulic fracturing
This article discusses the problems associated with the removal of proppant, mechanical particles of the rock and undecomposed fluid from the hydraulic fracture into the well. The necessity of developing a device for washing the perforation interval has been identified and justified. It is shown tha...
Na minha lista:
Principais autores: | , , , , , , , |
---|---|
Formato: | Статья |
Idioma: | English |
Publicado em: |
IOP Publishing Ltd
2020
|
Assuntos: | |
Acesso em linha: | https://dspace.ncfu.ru/handle/20.500.12258/14691 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
id |
ir-20.500.12258-14691 |
---|---|
record_format |
dspace |
spelling |
ir-20.500.12258-146912020-12-16T13:01:42Z Reduction of well stimulation period after hydraulic fracturing Verisokin, A. E. Верисокин, А. Е. Gunkina, T. A. Гунькина, Т. А. Vasilyev, V. A. Васильев, В. А. Shchekin, A. I. Щекин, А. И. Hydraulic fracturing Reduction of well stimulation period Foam systems This article discusses the problems associated with the removal of proppant, mechanical particles of the rock and undecomposed fluid from the hydraulic fracture into the well. The necessity of developing a device for washing the perforation interval has been identified and justified. It is shown that hardened and viscoelastic gel particles fall into perforations and adhere to the walls of channels and wells. Subsequently, these zones of gel deposition reduce permeability in perforation channels. The author has developed the design of a device for decolmation (declogging), which reduces the time for well development after hydraulic fracturing. To increase the productivity of the considered wells, it is necessary to flush them with the presented device in the mode of maximum approximation to deposits. To carry particles better to the surface, it is proposed to use foam systems generated by the jet pump, which is described in this article 2020-12-16T12:59:56Z 2020-12-16T12:59:56Z 2020 Статья Verisokin, A.E., Gun'Kina, T.A., Vasil'Yev, V.A., Shchekin, A.I., Serdyukov, D.Yu. Reduction of well stimulation period after hydraulic fracturing // IOP Conference Series: Materials Science and Engineering. - 2020. - Volume 952. - Issue 1. - Номер статьи 012001 http://hdl.handle.net/20.500.12258/14691 en IOP Conference Series: Materials Science and Engineering application/pdf IOP Publishing Ltd |
institution |
СКФУ |
collection |
Репозиторий |
language |
English |
topic |
Hydraulic fracturing Reduction of well stimulation period Foam systems |
spellingShingle |
Hydraulic fracturing Reduction of well stimulation period Foam systems Verisokin, A. E. Верисокин, А. Е. Gunkina, T. A. Гунькина, Т. А. Vasilyev, V. A. Васильев, В. А. Shchekin, A. I. Щекин, А. И. Reduction of well stimulation period after hydraulic fracturing |
description |
This article discusses the problems associated with the removal of proppant, mechanical particles of the rock and undecomposed fluid from the hydraulic fracture into the well. The necessity of developing a device for washing the perforation interval has been identified and justified. It is shown that hardened and viscoelastic gel particles fall into perforations and adhere to the walls of channels and wells. Subsequently, these zones of gel deposition reduce permeability in perforation channels. The author has developed the design of a device for decolmation (declogging), which reduces the time for well development after hydraulic fracturing. To increase the productivity of the considered wells, it is necessary to flush them with the presented device in the mode of maximum approximation to deposits. To carry particles better to the surface, it is proposed to use foam systems generated by the jet pump, which is described in this article |
format |
Статья |
author |
Verisokin, A. E. Верисокин, А. Е. Gunkina, T. A. Гунькина, Т. А. Vasilyev, V. A. Васильев, В. А. Shchekin, A. I. Щекин, А. И. |
author_facet |
Verisokin, A. E. Верисокин, А. Е. Gunkina, T. A. Гунькина, Т. А. Vasilyev, V. A. Васильев, В. А. Shchekin, A. I. Щекин, А. И. |
author_sort |
Verisokin, A. E. |
title |
Reduction of well stimulation period after hydraulic fracturing |
title_short |
Reduction of well stimulation period after hydraulic fracturing |
title_full |
Reduction of well stimulation period after hydraulic fracturing |
title_fullStr |
Reduction of well stimulation period after hydraulic fracturing |
title_full_unstemmed |
Reduction of well stimulation period after hydraulic fracturing |
title_sort |
reduction of well stimulation period after hydraulic fracturing |
publisher |
IOP Publishing Ltd |
publishDate |
2020 |
url |
https://dspace.ncfu.ru/handle/20.500.12258/14691 |
work_keys_str_mv |
AT verisokinae reductionofwellstimulationperiodafterhydraulicfracturing AT verisokinae reductionofwellstimulationperiodafterhydraulicfracturing AT gunkinata reductionofwellstimulationperiodafterhydraulicfracturing AT gunʹkinata reductionofwellstimulationperiodafterhydraulicfracturing AT vasilyevva reductionofwellstimulationperiodafterhydraulicfracturing AT vasilʹevva reductionofwellstimulationperiodafterhydraulicfracturing AT shchekinai reductionofwellstimulationperiodafterhydraulicfracturing AT ŝekinai reductionofwellstimulationperiodafterhydraulicfracturing |
_version_ |
1760600592592404480 |