IMPROVING THE EFFICIENCY OF WATER SHUT-OFF OPERATIONS IN GAS CONDENSATE WELLS WITH A SUBHORIZONTAL END OF THE TRUNK
The article discusses the main aspects of carrying out repair and insulation work to isolate the influx of formation water in wells with a subhorizontal borehole termination equipped with filters. To improve the technology for carrying out waterproofing work, requirements have been formed for compos...
में बचाया:
| मुख्य लेखकों: | , |
|---|---|
| स्वरूप: | Статья |
| भाषा: | English |
| प्रकाशित: |
Oil Gas Scientific Research Project Institute
2024
|
| विषय: | |
| ऑनलाइन पहुंच: | https://dspace.ncfu.ru/handle/123456789/29241 |
| टैग : |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|