Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Saved in:
| Main Author: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Format: | ВКР |
| Language: | Russian |
| Published: |
2025
|
| Online Access: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
by: Альбу-Салих Хуссейн Али Хачим
Published: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
by: Голлам Абед
Published: (2025) -
Improvement of the well cementing technology
by: Minchenko, Y. S., et al.
Published: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
by: Давир Ибран Мизрах Эль Неум
Published: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
by: Захер Девид Самех Нессим
Published: (2025)