Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Enregistré dans:
| Auteur principal: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Format: | ВКР |
| Langue: | Russian |
| Publié: |
2025
|
| Accès en ligne: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
par: Альбу-Салих Хуссейн Али Хачим
Publié: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
par: Голлам Абед
Publié: (2025) -
Improvement of the well cementing technology
par: Minchenko, Y. S., et autres
Publié: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
par: Давир Ибран Мизрах Эль Неум
Publié: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
par: Захер Девид Самех Нессим
Publié: (2025)