Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Spremljeno u:
| Glavni autor: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Format: | ВКР |
| Jezik: | Russian |
| Izdano: |
2025
|
| Online pristup: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Oznake: |
Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|
Similar Items
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
od: Альбу-Салих Хуссейн Али Хачим
Izdano: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
od: Голлам Абед
Izdano: (2025) -
Improvement of the well cementing technology
od: Minchenko, Y. S., i dr.
Izdano: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
od: Давир Ибран Мизрах Эль Неум
Izdano: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
od: Захер Девид Самех Нессим
Izdano: (2025)