Project for Cementing the Production Casing of an Exploration Well at the Udmurt UGS with a Detailed Examination of Coiled Tubing Corrosion Issues during Well Completion
Kaydedildi:
| Yazar: | Элбашбеши Махмуд Сами Ахмед |
|---|---|
| Materyal Türü: | ВКР |
| Dil: | Russian |
| Baskı/Yayın Bilgisi: |
2025
|
| Online Erişim: | https://dspace.ncfu.ru/handle/123456789/31869 |
| Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Development of Well Drilling Technology for the Production Casing Setting Interval at the Udmurt UGS with a Detailed Examination of Drilling Parameter Optimization
Yazar:: Альбу-Салих Хуссейн Али Хачим
Baskı/Yayın Bilgisi: (2025) -
The project of cementing the production column of an exploration well at the Udmurdsky UGS with consideration of the types of primary cementing of casing columns
Yazar:: Голлам Абед
Baskı/Yayın Bilgisi: (2025) -
Improvement of the well cementing technology
Yazar:: Minchenko, Y. S., ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Development of activities for increasing the quality of casing of the production column in the well of the Udmurt reserve UGS complex
Yazar:: Давир Ибран Мизрах Эль Неум
Baskı/Yayın Bilgisi: (2025) -
Development of well drilling technology for surface casing running interval at Udmurt UGS using a downhill motor
Yazar:: Захер Девид Самех Нессим
Baskı/Yayın Bilgisi: (2025)