Modeling a production well flow control system using the example of the Verkhneberezovskaya Area
The paper describes a methodology for developing an automated control system for a mineral water deposit. The mathematical model of the object is described. An equation describing the process of geofiltration is given. The solution of the equation is carried out using the method of frequency synthes...
保存先:
主要な著者: | Makarova, A. A., Макарова, А. А., Kaliberda, I. V., Калиберда, И. В., Pershin, I. M., Першин, И. М. |
---|---|
フォーマット: | Статья |
言語: | English |
出版事項: |
Institute of Electrical and Electronics Engineers Inc.
2022
|
主題: | |
オンライン・アクセス: | https://dspace.ncfu.ru/handle/20.500.12258/19595 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
The experimental studies to improve the measurements synchronization accuracy in the 10 kV feeder at zero crossing by calculated compensation of phase shift of voltage
著者:: Zvada, P. A., 等
出版事項: (2018) -
Complex optimization of signal frequency distortion in communication channels with OFDM
著者:: Fedorenko, V. V., 等
出版事項: (2019) -
Well surveys with jet pumps after hydraulic fracturing
著者:: Verisokin, A. E., 等
出版事項: (2022) -
Analysis of the spectral characteristics of complex phase-manipulated signals in the basis of the mellin integral transform
著者:: Ermakov, A. S., 等
出版事項: (2019) -
Reduction of well stimulation period after hydraulic fracturing
著者:: Verisokin, A. E., 等
出版事項: (2020)