Neidio i'r cynnwys

Load management strategies for redundant equipment in smart grids

A typical problem, which arises when planning the operation of Smart Grid equipment for the upcoming period of operation, is that of optimal time distribution of the load between the devices comprising the system. Frequently, these devices have been operated under dissimilar conditions and for diffe...

Disgrifiad llawn

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
Prif Awduron: Fedorenko, V. V., Федоренко, В. В.
Fformat: Статья
Iaith:English
Cyhoeddwyd: Institute of Electrical and Electronics Engineers Inc. 2018
Pynciau:
Mynediad Ar-lein:https://www.scopus.com/record/display.uri?eid=2-s2.0-85050698975&origin=resultslist&sort=plf-f&src=s&nlo=1&nlr=20&nls=afprfnm-t&affilName=north+caucasus+federal+university&sid=35ca32a259e3564d500373db190cc729&sot=afnl&sdt=sisr&cluster=scopubyr%2c%222018%22%2ct&sl=53&s=%28AF-ID%28%22North+Caucasus+Federal+University%22+60070541%29%29&ref=%28Load+management+strategies+for+redundant+equipment+in+smart+grids%29&relpos=0&citeCnt=0&searchTerm=
https://dspace.ncfu.ru/handle/20.500.12258/2904
Tagiau: Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
Disgrifiad
Crynodeb:A typical problem, which arises when planning the operation of Smart Grid equipment for the upcoming period of operation, is that of optimal time distribution of the load between the devices comprising the system. Frequently, these devices have been operated under dissimilar conditions and for different time periods. In this paper, we present a possible solution to the mentioned problem using the matrix game method, which is known to ensure the guaranteed reliability of redundant equipment. A model for accounting for the resource consumed by the devices of the redundant system, when one of the devices is operated at full load and the other is in reduced mode, is provided. The presented model can be applied when calculating the probability of failure-free operation of Smart Grid systems at optimised time intervals